Pool Project- Phase 3

This next phase of the pool was the Gunite phase. It's something like cement, but not as hard? I don't really know. But it started at 7 am and they didn't finished till late afternoon. They taped plastic on the house and covered windows, to protect it, so we didn't get to see much of what was happening. But it was very loud and quite messy. Here are the results.... We had to water this morning and night for 7 days so it didn't dry too quickly.

Our Summer Vacation

This summer we opted to not go on vacation so we could save up for a pool. But we did get to get away for a weekend of fun. First we headed to Brenham where we went on a Blue Bell Ice Cream Factory Tour. I think this is our 3rd time there and we just love it every time. In fact, if you visit, we will likely take you there. After our yummy tour, we headed to the main park in the town and the kids rode a Wooden Carousel for fun.

Wooden Carousel PIctures

Here are the rest of the Wooden Carousel Pictures. It moved pretty fast for being as old as it was. This carousel only runs once a week, so we were lucky to be in town while it was on.

Summer Vacation

I guess I can't post that many pictures, so I have to break it up. After our carousel ride, we headed to a movie Theater and got to see Ice Age Continental Drift. Each thing planned was a surprise to the kids, so it was fun to get to each activity with anticipation. After the movie, we drove a couple hours to San Marcos and checked into the hotel. We had dinner, jumped on bed, watch TV and headed to bed. The next morning we swam in the pool and then headed to the Outlets to do our school shopping. After a day of school shopping, we headed back home late Saturday night. It was a fun two days and it was good to have Doug finally take off some time from work.

Friday, September 28, 2012

Big Project- Phase 2

Now Phase 2 (I'm calling it) was when they put down wire to hold up the gunite (concrete like stuff) which forms the pool. They also put down the plumbing for the pool. I didn't like this part because Doug was in China for both Phase 1 and Phase 2 and I had to make decisions without him, because I couldn't get a hold of him. Not my favorite thing, but it all turned out fine in the end.

Big Project- Phase 1

It all started when we signed the papers the end of June. No wait... It started when we first experienced a very humid and hot spring/summer/fall, it was decided we would get a pool when we were settled or find a new job. Well, we found a great location to live, we feel very good about this area, so we decided to take the "Plunge". We are getting a pool. I took pics of nearly all of the phases. It's been a long summer and beyond watching the workers work and having them watch us live (we don't have blinds on our back windows). We're getting near the end of the pool project, so I thought I'd share some of these phases. Phase 1- Tear down fence (harder to do than you think, HOA HOA HOA headaches), and start a diggin....

Flower

Now I'm not a photographer, always wish I had the smarts to take great pics and edit. On one our little getaways this summer, we found beautiful flowers. I love bright colors.

Getting Ready...

Today I cleaned up the house and made 6 freezer meals. Now, I know they are all the same meal, but I'm hoping to add 6 more next week, etc. for the next 4 weeks. Then hopefully that will make it easier to survive when this baby comes. And then we'll have less Pizza too. I think I'll sleep really well tonight!